Skip to content

Commit

Permalink
Update Model_input_output.rst
Browse files Browse the repository at this point in the history
Output - updated the wording for cost-related outputs
  • Loading branch information
sherryyan1 authored Nov 20, 2023
1 parent 49aacce commit 17a9fa0
Showing 1 changed file with 3 additions and 3 deletions.
6 changes: 3 additions & 3 deletions doc/source/Model_input_output.rst
Original file line number Diff line number Diff line change
Expand Up @@ -323,13 +323,13 @@ The output file contains the following variables:
- Charged electricity of different storage technologies.

* - cost_v [dollar]
- Total cost over the planning period.
- Total cost (including total investment cost, total variable OM cost, and total fixed OM cost) over the planning period.

* - cost_var_v [dollar]
- Variable cost over the planning period.
- Total variable OM cost (including technology variable OM cost, transmission line variable OM cost, and fuel cost) over the planning period.

* - cost_fix_v [dollar]
- Fixed cost over the planning period.
- Total fixed OM cost (including technology fixed OM cost, transmission line fixed OM cost) over the planning period.

* - cost_new_v [dollar]
- Investment cost of technologies over the planning period.
Expand Down