test-suite: switch to Python 3 #1432
validate.yml
on: push
Matrix: build_on_rhel
Build on LEAP
2m 32s
Build on openEuler
1m 19s
check_spec
29s
Run markdown linter
4s
Build on CentOS Stream 9
2m 3s
Event File
2s
Matrix: lint
Annotations
6 errors
Build on RHEL (gnu12)
Process completed with exit code 1.
|
Build on RHEL (gnu13)
The job was canceled because "gnu12" failed.
|
Build on RHEL (gnu13)
The operation was canceled.
|
Build on openEuler
Process completed with exit code 1.
|
Build on CentOS Stream 9
Process completed with exit code 1.
|
Build on LEAP
Process completed with exit code 1.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
event-file
Expired
|
9.02 KB |
|