Skip to content

Benchmark of pallet-contracts and pallet-evm #17

Benchmark of pallet-contracts and pallet-evm

Benchmark of pallet-contracts and pallet-evm #17

Triggered via schedule January 13, 2024 00:51
Status Failure
Total duration 1h 5m 59s
Artifacts 1

benchmark.yml

on: schedule
build_dev_moonbeam
1h 0m
build_dev_moonbeam
Matrix: smart_contract_benchmark
collect
0s
collect
Fit to window
Zoom out
Zoom in

Annotations

5 errors
smart_contract_benchmark (ink-wasm, erc20)
Process completed with exit code 1.
smart_contract_benchmark (evm, erc20)
The job was canceled because "ink-wasm_erc20" failed.
smart_contract_benchmark (evm, erc20)
Process completed with exit code 1.
smart_contract_benchmark (sol-wasm, erc20)
The job was canceled because "ink-wasm_erc20" failed.
smart_contract_benchmark (sol-wasm, erc20)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
moonbeam Expired
264 MB